Featured Projects

logo

Clients Include:



Alabama Department of Transportation

Alabama Power Co.

Alabama State Port Authority

American Bridge

ARC Terminal Holdings

Atlantic Marine

BAE Systems

Baldwin County

Bay Equipment Co.

Ben Radcliff Contractors

Bender Shipbuilding & Repair

Berkel & Company

Boh Brothers

Brasfield & Gorrie

Brown & Root

Buchanan Lumber

C&G Boat Works

C. Thornton

CSX Transportation

City of Gulf Shores

City of Mobile

Coastal Fuel

Cooper Marine & Timberlands

Core Industries

Cowles, Murphy, Glover & Assoc.

El Paso

Esfeller

G.A. West

G.W. Norrell

Georgia Electric Co.

Green Simmons

Gulf Coast Prestress

Gulf Equipment Co.

H.G. Harders & Sons

H&M Construction

Halter Marine

Harbert International

Hosea O. Weaver & Sons, Inc.

Hunt Oil Company

International Paper Co.

John G. Walton

Johnson Bros. Corp.

Kimberly Clark

L & A Contracting

McInnis Corp.

Midstream Fuel Svs.

Mobile County

Newell Bush

OHM Remediation Svs.

Oil Recovery Co.

Pope Contracting

R.J. Baggett

Racon

Radcliff Economy Marine

S.J.& L

Scott Paper Co.

Shell Chemical

South East Power

Southern Co. Services

Southern Railroad

T.L. Wallace

Thompson Engineering

U.S. Steel

USS Alabama Battleship

US Coast Guard

US Navy

Vance McCown Construction Co.

W.G. Yates

Warrior Gulf & Navigation

Winsette Hill

Youngblood Barrett

Featured Projects

Click on the project below for more detail and pictures:

Cowin – Lorrain Road over Bernard Bayou.

USS Alabama Bulkhead and USS Drum Relocation

B-52 Relocation

Marine Terminal in Pascagoula, MS

Site Remediation at Kessler Air Force Base

Partial List of Projects

We have driven pile for many of the docks and piers owned by the Alabama State Port Authority, Alabama Shipyard, Atlantic Marine, Ingalls Shipbuilding and Bender Shipyard and Repair. Below are some of the many projects that we have been involved with from 1980 to the present time.

McDuffie Island Coal Handling Facility Ship Loading Dock #2

Client: 
Alabama State Port Authority

Work Description: Drove 30" square concrete for ship loading dock
and piles for associated conveyor system.

Dauphin Island Bridge Fender System

Client: Brown & Root
Owner: Alabama Department of Transportation
Work Description: Drove 10" x 30" flat concrete sheet piles
drove timber piles, erected timber fenders, and associated
earth fill and rip rap fill.

U.S. Highway 98 Bridge over Big Creek Lake

Client: Hosea O. Weaver & Sons, Inc.
Owner: Alabama Department of Transportation
Work Description: Drove 12" H-piles for bridge support,
poured substructure concrete, erected prestressed girders.

East Bay Florida Oil Platform Protection

Client: H.G. Harders & Sons, Inc.
Owner: Getty Oil
Work Description: Drove steel sheet piling coffer dam with
removable gate to enclose oil drilling rig. Also drove several
pipe pile mooring dolphins.

Bridge over Fowl River on Bellingrath Road

Client: NewMc, Inc.
Owner: Mobile County Commission
Work Description: Drove 18" square concrete piles for bridge support.

Bridge over Escatawpa River on U.S. 98

Client:  NewMc, Inc.
Owner: Alabama Department of Transportation
Work Description: Drove 12" H-Piles for bridge support,
installed coffer dams for river piers.

Dauphin Island Fishing Pier

Client:  NewMc, Inc.
Owner: Dauphin Island Park and Beach Board
Work Description: Drove Class "B" timber piles and erected
timbers for 800' timber fishing pier.

I-65 Bridge widening in Mobile, AL

Client: Harbert International
Owner: Alabama Department of Transportation
Work Description: Drove concrete bridge support piles at
several bridge locations on I-65 in Mobile.

Berth "E" Warehouse Alabama State Docks

Client: Plant Maintenance Contractors
Owner: Alabama State Port Authority
Work Description: Drove 14" square and 16" square concrete
piles for warehouse at pier "D".

Berth "E" Alabama State Docks

Client: H.G Harders & Sons, Inc.
Owner: Alabama State Port Authority
Work Description: Drove 24" square concrete for ship loading
Roll on/Roll off Dock and berthing dolphins.

Dock for Nucore-Yamatsu @ Blyville, Arkansas

Client:  H.G Harders & Sons, Inc.
Owner: Nucore-Yamatsu
Work Description: Drove pipe piles for dock, drove steel sheet pile cells
for breasting dolphins, drove steel sheet pile coffer inside steel mill.

Nine Bridges for Baldwin County, Alabama

Client: McInnis Corporation
Owner: Baldwin County Commission
Work Description: Drove 14" square concrete bridge support piles on
nine different bridges.

McDuffie Island Coal Handling Ship Unloading Dock No. 3

Client: R. J. Baggett, Inc.
Owner: Alabama State Port Authority
Work Description: Drove 20" square and 24" square concrete piles and
drove steel sheet piles for new ship unloading dock.

McDuffie Island Coal Handling

Client:  R. J. Baggett, Inc.
Owner: Alabama State Port Authority
Work Description: Drove 16" square and 20" square concrete piles for
conveyor system and barge loading dock.

U.S. Hwy. 98 and 31 over Tensaw River

Client:  McInnis Corporation
Owner: Alabama Department of Transportation
Work Description: Drove 36" square concrete piles, drove concrete
sheet piles, erected 72" bulb tees for bridge.

Liquid Bulk Terminal(Phenol)

Client: Ben M. Radcliff Contractor, Inc.
Owner: Alabama State Port Authority
Work Description: Drove 30" steel pipe piles, drove 18" square
concrete piles, drove several steel sheet pile cells, erected steel
H-Pile fendering, installed timber fender system.

Bay 6 Ingalls Shipyard

Client:  Ben M. Radcliff Contractor, Inc.
Owner: Northrop-Grumman
Work Description: Drove approximately 2,000 16" square and
18" square concrete piles for dock expansion at Ingalls West
Bank Facility.

Pier D-2 Alabama State Docks

Client:  R.J. Baggett
Owner: Alabama State Port Authority
Work Description: Drove 20" square concrete piles, drove
steel sheet piles, fabricated and installed timber fender system.

Alabama Hwy. 231 Bridge over Chickasaw Creek

Client: Hosea O. Weaver & Sons, Inc.
Owner: Alabama Department of Transportation
Work Description: Installed and excavated coffer dams, drove
14" H-Piles, formed and poured all substructure concrete,
erected 72" bulb tees and Type III AASHTO girders, formed
and poured superstructure concrete.

Goat Rock Combined Cycle Generating Plant - Unit No.'s 1,2 & 3

Client: Southern Company Generation
Owner: Southern Company Generation
Work Description: Installed 3,300 14" diameter auger cast piles for three
combined cycle generating plants.

Southern Drain System Phase II

Client: City of Mobile
Owner: City of Mobile
Work Description: Installed steel sheet pile wall along drainage canal,
repaired and extended 5 timber railroad bridges.

Barry Steam Plant - Fender System & Mooring System

Client: Alabama Power Company
Owner: Alabama Power Company
Work Description: Fabricated and installed timber fender system, drove
20" diameter steel pipe piles for barge mooring system.

Choctaw Point Container Terminal

Client: American Bridge
Owner:
Alabama State Port Authority
Work Description: Installed approximately 2000 LF of PA50/AZ18. Combined wall, temporary sharing & pipe penetrations in 4 locations, drove 5874 LF of 18" & 11,554 LF of 24" square concrete piles, all for new deck, relieving platform & crane rails.

Blue Creek Coal Terminal

Client: R.J. Baggett
Owner: Walters Energy
Work Description: Installed 870 LF of PA48/AZ19. Combined wall & 1460 LF of sheet pile wall, all for a new bulkhead.